(033) 321 0493 / +63 950 922 5190 sales@paenergy.ph
5.45kwp Grid-Tied System

5.45kwp Grid-Tied System

5.45kwp Grid-Tied system installed in Iloilo City Proper. The investment in the system will only take 4.3 years to recover because of a high return rate of 23.4% per annum. Apart from a high rate of return, this residence is protected from hikes in electricity prices....
PA Energy Installation of 3.43KWP

PA Energy Installation of 3.43KWP

Installation of 3.43kWp grid-tied system using tier 1 quality PV modules from Trina Solar in Phase 2, LJ Ledesma Subd., Brgy. Buhang, Jaro, Iloilo City.  Able to generate 391.02kWh/month or ?3,910.20/month in savings.   It would only take 4.6 years to...